Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Above Ceiling
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - LCEL - Electrical Above Ceiling | Partial Pass | 9/6/24: first floor conduit okay to pull electrical needs inspection on four boxes from line 20.5 to 14.5/ GRIDLINE E TO H 2ND floor is ready to pull wire. 3rd floor missing same as ground level 4th floor ready to pull wire. |
||
| 10/11/2024 | COT - LCEL - Electrical Above Ceiling | Passed | All transformers completed, grounded and bonded and all landed to the Main distribution panel. Tie in completed. Okay to proceed progress areas. 10/11/2024 |