Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - TC-COM-0324-00462
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 2-27-25, verified two-thirds of rebar layout/screws as per approved plans on preslab for second floor decking. Okay to pour concrete at progress areas. | |
| 03/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | balance of elevated floor. | |
| 06/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 12/02/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 12/2/24: added footings, excavation, and zoning inspection. Footings are dug for elevator shafts, column posts, and 95% of exterior walls. Rebar reinforcement is installed in elevator shaft pits, northeast corner of building for exterior walls, and 4 columns on northeast corner of building. Okay to pour these areas with concrete. PARTIAL PASS | |
| 12/19/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Balance of exterior footings. |