Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 02/27/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
2-27-25, verified two-thirds of rebar layout/screws as per approved plans on preslab for second floor decking. Okay to pour concrete at progress areas. |
| 03/04/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
balance of elevated floor. |
| 06/10/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
|
| 12/02/2024 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
12/2/24: added footings, excavation, and zoning inspection. Footings are dug for elevator shafts, column posts, and 95% of exterior walls. Rebar reinforcement is installed in elevator shaft pits, northeast corner of building for exterior walls, and 4 columns on northeast corner of building. Okay to pour these areas with concrete. PARTIAL PASS |
| 12/19/2024 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Balance of exterior footings. |