Permit: TC-COM-0225-00403

Parcel: 14020001B


Addresses:

860 E IRVINGTON RD

Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Underground 

Date Description Inspector Results Comments
02/17/2026 COT - HCEL - Electrical Underground  Partial Pass 2/17/26: 240' of (4) 3" conduit from SES location to future distribution panels on 2nd and 3rd floor, 240' of (2) 1 1/2" conduit for elevator location, ok to backfill progress area. Please call in for continuation of electrical underground.
02/18/2026 COT - HCEL - Electrical Underground  Partial Pass 2/18/26: 30' of (2) 3" conduit from SES location running east missing sweeps, 30' of (2) 2" conduit from SES location running east missing sweeps, 30' of (2) 1 1/2" conduit from SES location running east missing sweeps.
02/20/2026 COT - HCEL - Electrical Underground  Partial Pass 2/20/26: 120' of conduit from previous location to northwest elevators and risers for 3" to 2nd and 3rd floor HP and Elevator.
02/26/2026 COT - HCEL - Electrical Underground  Partial Pass 2.26.26
ses conduit at east wing
03/03/2026 COT - HCEL - Electrical Underground  Partial Pass 3/3/26: UFER APPROVED SOUTH WEST WING
03/24/2026 COT - HCEL - Electrical Underground  Partial Pass 3-24-26: verified trench depth at 2' 6" for schedule 40 electrical conduits for EV chargers. Conduit consists of 1" & 2" which runs north to south at each ends west side of site. Okay to backfill approximately 120' of open trench.
05/21/2026 COT - HCEL - Electrical Underground  Partial Pass 5-21-26: Verified 9-4" Schedule 40 electrical conduits stub ups at SES1 running towards TEP transformer. Okay to backfill approximately 8' of open trench using shading materials.
06/01/2026 COT - HCEL - Electrical Underground  Partial Pass 6/1/26: (9) 4" conduits for SES 2 (10' sweeps from building running east) @ NE corner
06/09/2026 COT - HCEL - Electrical Underground  Partial Pass 6-9-26: 3-4" schedule 40 electrical conduit stub ups for SES 1 located at south end of stair 3. Okay to backfill progress areas.
06/18/2026 COT - HCEL - Electrical Underground  Partial Pass 6-18-26: verified 3-4" schedule 40 (10' sweep running north to south) stub ups for SES 1.2 at southeast corner of stair 3.
07/27/2026 COT - HCEL - Electrical Underground  Partial Pass 7-27-26: inspected a total of 14 light pole cages. 6 located on west side, 4 on the north and remainder at the east. Reinforcement all verified per plans, however, excavation/loose fill and debris were noted on the 3 light pole cage on west side. Please excavate to 7' 6" and provide 3" clearance at the bottom/remove loose fill. 2-located on the northwest side must have loose fill removed from bottom and provide 7' 6" on the light pole cage furthest northwest. The other cage on the north side must have the loose fill removed together with the 2- on the east side. Please schedule an inspection on those mentioned above prior to pour. Remainder are okay for concrete.
08/04/2026 COT - HCEL - Electrical Underground  Partial Pass Southwest corner secondaries in place at new transformer. Total of 9 4” schedule 40 at 4 1/2’ to SES 1.
Total of 6 ran to SES 1.
North east corner secondaries in place at new transformer total of 13 4” schedule 40 at 4 1/2’ depth. Ran just shy at sweeps. Pending tie into rest and SES 2. Okay to backfill all progress areas. Shading required. Ensure caution tape is in place after backfill. 8/4/2026
08/06/2026 COT - HCEL - Electrical Underground  Re-inspection required 8/6/26: (15) 4" Sch 40. Conduit required from transformer to ses#2 at east wing per revised set that has not been submitted to the city for approval. The approved plan set call for (9) 4" Sch 40. Revision must be submitted to the city for approval. Approved plans must be used for construction.
08/07/2026 COT - HCEL - Electrical Underground  Partial Pass 8-7-26: per previous notes from 8/6/26, There are a Total of 15-4" schedule 40 conduits at the East wing SES2. Today, I verified 2-4" schedule 40 conduits which weren't in place from yesterday's inspection-okay to backfill approximately 100' of trench using shading materials. Note: backfilling will be at own risk pending RFI approval.