Permit: TC-COM-0225-00403

Parcel: 14020001B


Addresses:

860 E IRVINGTON RD

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Roof Nailing 

Date Description Inspector Results Comments
06/03/2026 COT - HCBU - Roof Nailing  Partial Pass 6-3-26: Section C-2nd floor deck nailing inspection. Install 2" sections of missing sheathing along the west side edges and complete sheathing/deck nailing at west & east pop out areas. Please schedule a re-inspection for mentioned areas but you may continue with construction at other progress areas.
06/10/2026 COT - HCBU - Roof Nailing  Partial Pass 6-10-26: roof nailing at 2nd floor decking north of stair 3 and all of east wing approved. Okay to continue with framing at progress areas.
06/22/2026 COT - HCBU - Roof Nailing  Partial Pass 6-22-26: partial pass on south wing of 3rd floor decking/nailing approved. Pending northeast side of decking up to tower. Okay to continue with construction at progress areas.
06/24/2026 COT - HCBU - Roof Nailing  Partial Pass 6-24-26: nailing at Exterior Walls behind the Electrical Gear ( East and South Wings) approved. Okay to install 2nd layer of OSB for electrical gear.
07/06/2026 COT - HCBU - Roof Nailing  Not Ready 7/6/2026 not ready. 2nd Floor NWC, 3rd Floor East Wing nailing cannot penetrate sheathing more than an 1/8" throughout.
07/09/2026 COT - HCBU - Roof Nailing  Partial Pass 7/9/2026 Partial pass. 3rd floor east wing. 2nd floor NW corner approved for nailing at decking.
07/13/2026 COT - HCBU - Roof Nailing  Partial Pass 7/13/2026 partial pass. 4th floor south wing approved for deck nailing.
07/14/2026 COT - HCBU - Roof Nailing  Partial Pass 7-14-26: total of 9 shear walls at 1st floor south wing inspected. Add anchor bolts with washers at marked locations. Add nails to top plates splices located at party walls or load bearing walls-see plans and details for more information. Nailing at sheathing together with hold-downs verified per plans. We must re-inspect anchor bolts and nails at any splice prior to covering up.
07/16/2026 COT - HCBU - Roof Nailing  Partial Pass 7-16-26: 3rd floor south wing deck nailing from mid-point to north approved.
07/22/2026 COT - HCBU - Roof Nailing  Partial Pass 3rd floor north west corner from elevator shaft to west perimeter walls. 7/22/2026
07/28/2026 COT - HCBU - Roof Nailing  Partial Pass 7-28-26: 4th floor roof deck and parapets along south wing approved. Okay to install roof crickets-call for nail inspection on crickets prior to covering.
07/31/2026 COT - HCBU - Roof Nailing  Partial Pass 7-31-26: 4th floor south wing (south to North) roof nailing approved.
08/07/2026 COT - HCBU - Roof Nailing  Partial Pass 8-7-26: 4th. floor roof decking at south wing from the midway point all the way to north end including parapet walls approved. Okay to install roof crickets. Schedule a cricket nailing inspection prior to covering those areas. Remaining roof decking okay to dry-in.
08/14/2026 COT - HCBU - Roof Nailing  Partial Pass 8/14/26: 4TH FLOOR DECKING APPROVED ON (1/2) EAST WING
08/16/2026 COT - HCBU - Roof Nailing  Partial Pass 8.17.26
4th floor east side decking.
08/27/2026 COT - HCBU - Roof Nailing  Partial Pass 8-27-26: roof deck-East section together with south tower roof & parapet nailing approved. Okay to continue with construction at progress areas.
09/15/2026 COT - HCBU - Roof Nailing  Partial Pass 9/15/26: Roof nailing for crickets at Area A approved. Okay to continue with construction at progress areas.