Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2026 | COT - HCEL - Electrical Intermediate | Not Ready | 9/30/2026 1st floor in wall electrical. Not ready. Units 116 ( add nail plates to lines that are less than an 1 1/4". Units 117 ( exhaust fan not tied in, missing puddy packs throughout. Provide plastic bushing for feeders, seal underground raceways, receptacle spacing exceeding 12'. Seal through wall penetrations. Stopped inspection. Ensure to schedule electrical above ceiling at next inspection. | |
| 10/06/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 10/6/26: add supports for exhausts at 4' intervals at each unit inspected & missing bathroom exhaust tie-in/see previous notes, laundry exhausts too long -does not meet code requirements-possible RFI for installation of a fan, 129, 128-fire caulk penetrations at south wall at bedroom, seal exterior wall penetrations, 127, 126-dwv penetration at south party wall, 125, 124, 123, 122-seal party wall penetrations. Per C404.4 of the IECC, requires that 1/2 hot pex lines be insulted-add insulation to pex lines in wall & above ceiling. Note: mechanical not ready. Electrical in listed above unit's approved. |
|
| 10/16/2026 | COT - HCEL - Electrical Intermediate | Re-inspection required | 10/16/26: MEP 2nd floor Southwing Unit's 230-, provide RFI for post adjacent to window, add stud to exterior wall at marked location-seal top plate of DWV at laundry, tie in sprinkler, insulate hot leg of copper, seal penetration at decking, laundry exhaust length does meet code-submit RFI fix on all A units, 228- add a strap to duct at marked location, seal penetration at party wall, seal DWV at decking-top & bottom, add insulation to copper line, fha plates required at top plates of load bearing walls, add mechanical tape to flex, seal exterior wall to- plates, 229- missing hanger, fha plate, 226-seal DWV at decking in restroom, tie in sprinkler, seal penetrations at marked locations, add fha plates at top plates where DWV & exhausts penetrate, 224-fha at load bearing walls, add stud to marked area at exterior wall, add nail guards to marked locations, insulate hot leg of copper line, 223-tie in sprinkler, tie in condensation line, insulate hot leg of copper line, fha plates required top & bottom of all load bearing walls, 229-Boca plates where top plates are over notched more than 50 percent, stud required at south west corner-over notched, 227-2x6 king and exterior studs at southwest corner & structural plates, 225-seal penetrations, insulate hot copper line, secure low voltage. |