Inspection Status: Partial Pass

Inspection History: COT - HCBU - Preslab  

Date Description Inspector Results Comments
07/02/2024 COT - HCBU - Preslab   Partial Pass 7/2/24: rebar reinforcement at pour back per plan at rooms (114,117,112,111,110,105,120)
07/16/2024 COT - HCBU - Preslab   Partial Pass Column line D & C. Grid line 8 & 10. Pallets #119. Big slab per plans and details okay for concrete placement. 7/16/2024
08/02/2024 COT - HCBU - Preslab   Partial Pass Column line C grid line 9
Detail 101 for saw cut slab at existing slab on grade for small equipment pad. Okay for concrete placement. 8/2/2024
08/13/2024 COT - HCBU - Preslab   Canceled Canceled per contractor. 8/13/2024
08/28/2024 COT - HCBU - Preslab   Partial Pass new switch gear. Tapping into existing distribution board. (SES 3B). Rebar dowels in place along with wire mesh for the upper pad. Okay for concrete placement. 8/28/2024
09/09/2024 COT - HCBU - Preslab   Passed