Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2026 | ENGR Engineering Final | Partial Pass | Conditions on the building permit need to be satisfied. Otherwise site/ DP are complete. | |
| 10/23/2026 | ENGR Engineering Final | Passed |