Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2026 | ENGR Engineering Final | Partial Pass | OK for TCO level 2. Basins on inside of parking lot parking area and parking space that is puddling needs to be repaired before higher level TCO can be obtained. |
|
| 05/13/2026 | ENGR Engineering Final | Partial Pass | No change from previous inspection. Okay for level 2 TCO. Signage still needs to go up on the building as well as asphalt fix by Refuse Enclosure.. | |
| 05/19/2026 | ENGR Engineering Final | Re-inspection required | Address # needs to face Old Vail Rd. |