Permit: TC-COM-0124-00199

Parcel: 129091410

Inspection Status: Canceled

Inspection History: COT - HCBU - Masonry Pregrout 

Date Description Inspector Results Comments
01/07/2026 COT - HCBU - Masonry Pregrout  Canceled Contractor cancelled due to weather.
01/08/2026 COT - HCBU - Masonry Pregrout  Partial Pass North side of building at loading dock area; 2 each pass-through areas to be cut in wall: 4 support masonry columns to support pass-through beam. Ok to place concrete in support cut areas.
02/27/2026 COT - HCBU - Masonry Pregrout  Partial Pass 2/27/2026 partial pass. East retaining wall approved. Okay to grout at top out.
10/22/2025 COT - HCBU - Masonry Pregrout  Canceled 10-22-25: canceled by contractor.
10/23/2025 COT - HCBU - Masonry Pregrout  Partial Pass South loading dock wall at GL: 5 - 13; approximately 225 feet. OK to place concrete in progress areas.
10/28/2025 COT - HCBU - Masonry Pregrout  Partial Pass 10/28/25
Partial pass, ok to proceed east and north walls.
11/03/2025 COT - HCBU - Masonry Pregrout  Partial Pass
11/06/2025 COT - HCBU - Masonry Pregrout  Partial Pass 11/6/2025 2nd lift at east wall. Column 15 grid lines A-D approved. Okay to grout progress areas.
11/20/2025 COT - HCBU - Masonry Pregrout  Partial Pass North, South, and East,walls are topped-out. Ok to grout progress areas.