Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Intermediate
Permit Number - TC-COM-0124-00185
Inspection Description - COT - HCPL - Plumbing Intermediate
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/05/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | 9/5/24: plumbing underground per plans and under test. Ok to proceed with backfill. | |
12/05/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | 9/5/24: plumbing underground per plans and under test. Ok to proceed with backfill. 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test. 12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals. Insulation required at hot water piping |