Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Progress
Permit Number - TC-COM-0124-00185
Inspection Description - COT - HCEL - Electrical Progress
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2025 | COT - HCEL - Electrical Progress | Partial Pass | 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test. 12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals. 12/19/24: electrical in wall passed. Ok to cover up walls. 1/16/24: electrical above ceiling in hallways 105,116 ok for drywall at hard lid area. |
|
10/30/2024 | COT - HCEL - Electrical Progress | Partial Pass | 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test. | |
12/05/2024 | COT - HCEL - Electrical Progress | Not Ready | 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test. 12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals. |
|
12/19/2024 | COT - HCEL - Electrical Progress | Partial Pass | 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test. 12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals. 12/19/24: electrical in wall passed. Ok to cover up walls. |