Parcel: 14042074A


Addresses:

7150 S TUCSON BL


Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Progress  

Permit Number - TC-COM-0124-00185

Inspection Description - COT - HCEL - Electrical Progress  

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/16/2025 COT - HCEL - Electrical Progress   Partial Pass 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals.
12/19/24: electrical in wall passed. Ok to cover up walls.
1/16/24: electrical above ceiling in hallways 105,116 ok for drywall at hard lid area.
10/30/2024 COT - HCEL - Electrical Progress   Partial Pass 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/05/2024 COT - HCEL - Electrical Progress   Not Ready 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals.
12/19/2024 COT - HCEL - Electrical Progress   Partial Pass 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals.
12/19/24: electrical in wall passed. Ok to cover up walls.