Parcel: 14042074A


Addresses:

7150 S TUCSON BL


Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Permit Number - TC-COM-0124-00185

Inspection Description - COT - HCPL - Plumbing Progress 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/10/2025 COT - HCPL - Plumbing Progress  Partial Pass 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals. Insulation required at hot water piping
2/10/25: gas pressure test passed. Ok to proceed.
04/16/2025 COT - HCPL - Plumbing Progress  Partial Pass 4-16-25, plumbing,mechanical/electrical progress approved. Ongoing construction to HVAC in a few areas, seismic wires in place and most of the junction boxes above the grid are labeled. Okay to continue with construction.
10/30/2024 COT - HCPL - Plumbing Progress  Partial Pass 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/05/2024 COT - HCPL - Plumbing Progress  Partial Pass 10/30/24: framing per plans at rooms 100,101,102,103,104,105,106,107,108,109,110,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129. Ok to one side. Electrical in wall not complete missing grounding at multiple boxes and pending boxes being installed with conduit runs throughout, plumbing in wall at require plastic garments throughout, plumbing must be under test, access panels must be installed at shut off valves and A.V.V, pending completion of plumbing in walls and test.
12/5/24: partial pass for plumbing in wall. Multiple hangers at copper piping must be replaced or protection must be added to prevent contact between copper piping and dissimilar metals. Insulation required at hot water piping