Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2024 | COT - HCBU - Framing | Partial Pass | 5/9/24: framing at Thunder canyon bar area partial pass. (Pending fire caulk at penetrations and backing for foot rail), framing at arbuckles passed. | |
| 05/13/2024 | COT - HCBU - Framing | Partial Pass | 5/9/24: framing at Thunder canyon bar area partial pass. (Pending fire caulk at penetrations and backing for foot rail), framing at arbuckles passed. 5/13/24: fire caulk at penetrations at bar passed ok to cover progress areas. (Pending fire caulk at first floor under bar and penetrations for new panel location). |
|
| 06/03/2024 | COT - HCBU - Framing | Passed |