Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/09/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Will need verification of 6” bollards footings, concrete pad, and fence post footings, 3rd party engineering testing and inspection reports prior to recall of Engineering Final. |
| 02/21/2024 |
ENGR Engineering Final
|
|
Not Ready |
Fire dept. still needs to complete inspection and main office still has not provided 3rd party inspection paperwork for the bollards surrounding fuel storage tank. |
| 03/25/2024 |
ENGR Engineering Final
|
|
Canceled |
|
| 03/26/2024 |
ENGR Engineering Final
|
|
Passed |
Fire Department has signed off on fuel tank inspection. |