Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T99CM01407

Parcel: 137279710

Inspection Status: Correction Required

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
04/16/1999 BUILDING PRE-SLAB Correction Required ADDTL COMMS - 1. PLANS CALL FOR SIMPSON PAHD42 THESE REQUIRE 2-6 OF #4 UNDER EACH STRAP. THE CONTRACTOR WANTS TO INSTALL HPAHD 22 THAT DO NOT REQUIRE #4 IN A POST TENSION SLAB PER SIMPSON. PLANS SHOULD BE CHANGED TO REFLEX THIS.