Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/16/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 01/12/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - O.K. TO CONTUNUE TO INTERMEDIATES, NILL REVISE PLANS FOR ADDED WINDOWS AND TRUSS CALCS. 1. CHECK LTT 20BS AT SHEAR WALLS INSIDE, AT BACK OF HOUSE AND AT GARAGE SHEAR. 2. CHECK INTERIOR SHEAR WALL TRANSFER AT INTERTERMED. 3. PROVIDE SKEWED RAFTER HANGER AT SACK TRUSSES. (BOTH SIDES) AND A35S AT TOP. 4. DOUBLE STUDS UNDER GIRDER TRUSS EACH SIDE. |
| 01/12/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
IVRS - Inspection 0000* |
| 12/27/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - BIRD BLOCKS NOT COMPLETE. GABLE END TRUSS AT BACK OF HOUSE NOT PROPERLY LOADING ON PATIO COLUMN. PROVIDE 2 1/2 ABS AT EAWCH SOLE PLATE, AT REAR PATIO COLUMN. PLANS NEED TO BE REVISED TO SHOW 2 ADDED WINDOWS. WINDOW AT KITCHEN WILL REQUIRE 2 2 X 12 AT HEADER. NO APPROVED TRUSS CALCS ON SITE. CANNOT VERIFY HOLDDOWNS OR SHEARWALL NAILING. GARAGE DOOR SHEARWALLS HAVE BEEN CHANGED. REVISE PLANS TO CHECK DOOR HEADER SIZE AND SHER WALLS WITH HOLD DOWNS. STOPPED INSPECTION |
| 12/27/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999* |
| 12/20/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. NO PLANS OR PERMIT ON SITE, NO ONE PRESENT ON SITE EXT. ALREADY LATHED? |
| 12/20/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 12/16/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - HOLD DOWNS MISSING AS PER PLAN. HOUSE HAS BEEN LATHED AND CANNOT VERIFY CLIPS. BOLTS MISSING AT PATIO POST COLUMNS. TRUSSES ARE NOT NAILED COMPLETELY TO LEDGER AND SOME CLIPS ARE MISSING. MUST CORRECT ALL WORK FROM PRIOR INSPECTION BEFORE CALLING FOR INSPECTION. |
| 12/16/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999* |
| 12/14/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - JOB SITE LOCKED. NOTE - CALLING FOR 1025 AND HOUSE HAS BEEN LATHED |
| 12/14/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999* |
| 12/08/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - NO PLANS OR PERMIT ON SITE. APPEARS THAT CORRECTIONS FROM LAST INSPECTION WERE NOT CORRECTED. ALSO HOUSE HAS BEEN COVERED WITH STUCCO MESH |
| 12/08/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
DENIED |
| 11/03/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - TC 24 NOT INSTALLED PER MFG SPECS. TRUSSES NOT CLIPPED FRONT & REAR. GARAGE FRONT BEAM NOT STRAPPED. MISSING 1 HOLD DOWN PAHD42 USED PA23S. DETAIL 16/6 NOT INSTALLED 3 WALLS. ANCHOR BOLTS MISSING AT BACK PATIO PEAK. ANCHOR BOLTS AT FRONT OF GARAGE SHEARWALL TWO MINIMUM. STOPPED INSPECTIONS. |
| 11/03/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
DENIED |
| 10/29/1999 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |