Inspection Status: Correction Required
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/22/1999 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - 1. RAFTERS NOTCHED MORE THAN 25%. 2. HEAD ST 22 STRAPS PEAK ACROSS. RIDGE BOARD ATTACHED TO RAFTERS. 3. ROOF PITCH LESS THAN 3/12 TO HAVE REQUIRED BEAM OR COLLAR TIES INSTALLED. 4. EXCAVATE POST FOOTINGS, CALL FOR INSPECTION. 5. POUR AFTER APPROVAL. ATTACH POSITIVE CORRECTIONS,BOTH ENDS PORCH PORTS. 6. INSTALL H25S PORCH RAFTER TO BEAM. |
| 09/22/1999 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999* |
| 09/20/1999 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - OK TO DRY IN ROOF. NEED PLAN REVISED TO SHOW CHANGES BEFORE NEXT INSPECTION. NEED 1/8 GAP BETWEEN ALL EDGES OF PLYWOOD. |
| 09/20/1999 |
ROOF NAILING |
|
Denied |