Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T98CM01077

Parcel: 136250010


Addresses:

6501 E 38TH ST

Inspection Status: Correction Required

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
08/03/1998 PLUMBING - GAS PRESSURE TEST Correction Required ADDTL COMMS - 1. I LEFT A CHART FOR SIZING GAS LINES. 2. TO MAKE SURE 3/4 IS SUFFICENT I CAN SIZE YOUR GAS LINE BUT NEED A DIAGRAM WITH MEASURMENTS SEE BACK OF CHART.
07/31/1998 PLUMBING - GAS PRESSURE TEST Correction Required ADDTL COMMS - 1. GAS METAL LOCKED OUT WILL GLUE GAS TAG TO HAVE GAS TURNED BACK ON TEMPORARILY ( RECALL AS SOON AS POSSIBLE ). 3. 1/2 GAS LINE AT NEW ADDITION WHERE AND WHAT IS IT FOR, NEED TO SIZE GAS LINE PER D.T.V DEMAND. 4. UNION NOT ALLOWED INSIDE WALL, USE RIGHT HAND LEFT HAND COUPLING ( YOU WONT FIND THEM AT HOME DEPOT LOUS PLUMBING. 4. UNION NOT ALLOWED INSIDE WALL, USE RIGHT HAND LEFT HAND COUPLING ( YOU WONT FIND THEM AT HOME DEPOT LOUS PLUMBING.
07/31/1998 PLUMBING - GAS PRESSURE TEST Partial Approval PARTIAL APPROVAL