Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/03/1998 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. I LEFT A CHART FOR SIZING GAS LINES. 2. TO MAKE SURE 3/4 IS SUFFICENT I CAN SIZE YOUR GAS LINE BUT NEED A DIAGRAM WITH MEASURMENTS SEE BACK OF CHART. |
| 07/31/1998 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. GAS METAL LOCKED OUT WILL GLUE GAS TAG TO HAVE GAS TURNED BACK ON TEMPORARILY ( RECALL AS SOON AS POSSIBLE ). 3. 1/2 GAS LINE AT NEW ADDITION WHERE AND WHAT IS IT FOR, NEED TO SIZE GAS LINE PER D.T.V DEMAND. 4. UNION NOT ALLOWED INSIDE WALL, USE RIGHT HAND LEFT HAND COUPLING ( YOU WONT FIND THEM AT HOME DEPOT LOUS PLUMBING. 4. UNION NOT ALLOWED INSIDE WALL, USE RIGHT HAND LEFT HAND COUPLING ( YOU WONT FIND THEM AT HOME DEPOT LOUS PLUMBING. |
| 07/31/1998 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
PARTIAL APPROVAL |