Inspection Status: Passed
Inspection History: TRSP - ROW - Recurring
Permit Number - T22RW00054
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2022 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - All electric work completed prior to silverbell widening. No further issues | |
08/03/2022 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - All electric work completed. Work was done prior to Silverbell widening. Capital project. Any issues were resolved daily. | |
05/09/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Precon for upcoming work on site | |
03/15/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All new poles have been added and are in place. All overhead aerial wire has been installed. Small issue still needed | |
03/15/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Poles and electric work still in progress. O | |
02/24/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pre construction discussion with Noel with Vargas Construction, sub-contractor for TEP. Relocatation of AG and UG electric. 20 poles and 5 new foundations on this stretch. Working from Silverbell and Sweetwater (2 Foundations) and heading south to end. Work to start 2/28 and take 3 weeks. | |
02/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All pole bases have been installed. Contractor will fall back and install tops. No issues but traffic has been bad at times. | |
02/09/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Digging and setting two poles a day. Traffic congestion daily, flaggers are in use. Traffic control removed before 3:30 daily | |
01/05/2023 | TRSP - ROW - Recurring | Passed | ||
02/03/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Precon was held prior to construction. Notices were installed along roadway on 4 x 4 post. Pole installation along the west side of Silver Bell. All work is being performed in dirt area. Barricades will be moving daily as work proceeds. Poles are being brought in as needed and not stored on site |