Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
Permit Number - T22OT00445
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - ENGR - Signage Final | Not Ready | ||
08/29/2022 | COT - ENGR - Signage Final | hthrall1 | Approved | Entered by HTHRALL1 - |
08/22/2022 | COT - ENGR - Signage Final | hthrall1 | Partial Approval | Entered by HTHRALL1 - RE: sign review For: wall and drive thru signage AT: new Starbucks / 4702 E Grant Road Sign Permit: T22OT00445 Reviewer: H. Thrall Date: 6/23/22 Status: Partial approval Codes: Unified Development Code (UDC) 7A Sign Standards, National Electrical Code (NEC), Tucson Pima County Outdoor Lighting Code (OLC), and International Building Code (IBC) 2018 1. UDC: a) Frontage is the full length of the property lines along Swan and Grant, per development plan. b) UDC 74.5.6.2.b - provide a notation that all sign structures in drive thru will be setback a minimum of 1' from face of curb to leading edge of sign structure 2. NEC: a. Note location of labeled breaker panel for sign circuits / inspections. b. Provide notation on total number of circuits 3. OLC: a. No comments, thank you! 4. IBC: a. On sign D (canopy sign), provide detailed labeled mounting specs for the type and size / length / number of screws and or bolts to mount the letters to the raceway and to mount the raceway to the canopy. Send updated plans to Heather.Thrall@tucsonaz.gov |
05/12/2023 | COT - ENGR - Signage Final | Passed |