Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - ENGR - Signage Final |
|
Not Ready |
|
| 08/29/2022 |
COT - ENGR - Signage Final |
hthrall1 |
Approved |
Entered by HTHRALL1 - |
| 08/22/2022 |
COT - ENGR - Signage Final |
hthrall1 |
Partial Approval |
Entered by HTHRALL1 - RE: sign review
For: wall and drive thru signage
AT: new Starbucks / 4702 E Grant Road
Sign Permit: T22OT00445
Reviewer: H. Thrall
Date: 6/23/22
Status: Partial approval
Codes: Unified Development Code (UDC) 7A Sign Standards, National Electrical Code (NEC), Tucson Pima County Outdoor Lighting Code (OLC), and International Building Code (IBC) 2018
1. UDC:
a) Frontage is the full length of the property lines along Swan and Grant, per development plan.
b) UDC 74.5.6.2.b - provide a notation that all sign structures in drive thru will be setback a minimum of 1' from face of curb to leading edge of sign structure
2. NEC:
a. Note location of labeled breaker panel for sign circuits / inspections.
b. Provide notation on total number of circuits
3. OLC:
a. No comments, thank you!
4. IBC:
a. On sign D (canopy sign), provide detailed labeled mounting specs for the type and size / length / number of screws and or bolts to mount the letters to the raceway and to mount the raceway to the canopy.
Send updated plans to Heather.Thrall@tucsonaz.gov
|
| 05/12/2023 |
COT - ENGR - Signage Final |
|
Passed |
|