Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T22OT00445

Parcel: 121100020


Addresses:

4702 E GRANT RD

Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Date Description Inspector Results Comments
10/27/2022 COT - ENGR - Signage Final Not Ready
08/29/2022 COT - ENGR - Signage Final hthrall1 Approved Entered by HTHRALL1 -
08/22/2022 COT - ENGR - Signage Final hthrall1 Partial Approval Entered by HTHRALL1 - RE: sign review For: wall and drive thru signage AT: new Starbucks / 4702 E Grant Road Sign Permit: T22OT00445 Reviewer: H. Thrall Date: 6/23/22 Status: Partial approval Codes: Unified Development Code (UDC) 7A Sign Standards, National Electrical Code (NEC), Tucson Pima County Outdoor Lighting Code (OLC), and International Building Code (IBC) 2018 1. UDC: a) Frontage is the full length of the property lines along Swan and Grant, per development plan. b) UDC 74.5.6.2.b - provide a notation that all sign structures in drive thru will be setback a minimum of 1' from face of curb to leading edge of sign structure 2. NEC: a. Note location of labeled breaker panel for sign circuits / inspections. b. Provide notation on total number of circuits 3. OLC: a. No comments, thank you! 4. IBC: a. On sign D (canopy sign), provide detailed labeled mounting specs for the type and size / length / number of screws and or bolts to mount the letters to the raceway and to mount the raceway to the canopy. Send updated plans to Heather.Thrall@tucsonaz.gov
05/12/2023 COT - ENGR - Signage Final Passed