Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2024 | COT - HCPL - Rough Soil | Partial Pass | 1/25/24: plumbing underground in building per plan ok to back fill. Shading required. | |
| 02/02/2024 | COT - HCPL - Rough Soil | Passed | 1/25/24: plumbing underground in building per plan ok to back fill. Shading required. 2/2/24: plumbing underground and sewer connection complete. Grease interceptor installed per plans and tested ok to proceed and backfill. |