Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2023 | RSBU - Building Final | Not Ready | 6-28-23: First lift. Note: Existing bedroom window compliant with emergency escape and rescue requirements of the IRC has been closed up per plan; side window will now need to be modified to comply with emergency escape and rescue opening requirements of IRC. Homeowner notified today. Front attached porch has combustible construction within 3 feet of property line, not shown on plans; will need to be mitigated prior to Final Inspection. |
|
| 08/28/2023 | RSBU - Building Final | Re-inspection required | Not ready. Pending intermediate inspections corrected. Missing smoke detectors in bedroom and outside of bedroom. Add nail plates to plumbing lines that are less than an 1" 1/4. Fire foam all top penetrations. Add ground screws to fan boxes. Laundry line has created an S trap. Need minimum 4". Secure pex line above ceiling in bathroom. 8/28/2023 | |
| 09/01/2023 | RSBU - Building Final | Partial Pass | 6-28-23: First lift. Note: Existing bedroom window compliant with emergency escape and rescue requirements of the IRC has been closed up per plan; side window will now need to be modified to comply with emergency escape and rescue opening requirements of IRC. Homeowner notified today. Front attached porch has combustible construction within 3 feet of property line, not shown on plans; will need to be mitigated prior to Final Inspection. Not ready. Pending intermediate inspections corrected. Missing smoke detectors in bedroom and outside of bedroom. Add nail plates to plumbing lines that are less than an 1" 1/4. Fire foam all top penetrations. Add ground screws to fan boxes. Laundry line has created an S trap. Need minimum 4". Secure pex line above ceiling in bathroom. 8/28/2023 9/1/23: all corrections made |
|
| 11/03/2023 | RSBU - Building Final | Passed |