Permit: T22CM07347

Parcel: 132111770

Inspection Status: Not Ready

Inspection History: COT - RSBU - Roof Nailing 

Date Description Inspector Results Comments
05/07/2024 COT - RSBU - Roof Nailing  Not Ready 11/8/23: SIMPSON ABU BASE PLATE need to be added at 4"x4" porch column, ROOF JOIST AT RIDGE BOARD missing nailing per plan (detail S1/3), discrepancy in plans at porch beams (plans call for (2) 4"x8" beams only one is installed, headers at windows and door openings not per plan, openings at bathroom and bedroom missing, 4"x4" wood column supporting 6"x12" ridge-line beam missing, 6"x12" ridge-line beam missing, 2"x4" exterior wall at bathroom not per plan, anchor bolts must be no greater than 12" from sill plate edge, 8 hold downs are missing per plan, back porch is not in plans and is 3' from lot line. Set backs are not per plans.

Courtesy inspection on the corrections that need to be made. 11/13/2023

5/7/24: Not ready. per previous
06/24/2025 COT - RSBU - Roof Nailing  Passed 6/24/25
All corrections have been made.
11/08/2023 COT - RSBU - Roof Nailing  Re-inspection required 11/8/23: SIMPSON ABU BASE PLATE need to be added at 4"x4" porch column, ROOF JOIST AT RIDGE BOARD missing nailing per plan (detail S1/3), discrepancy in plans at porch beams (plans call for (2) 4"x8" beams only one is installed, headers at windows and door openings not per plan, openings at bathroom and bedroom missing, 4"x4" wood column supporting 6"x12" ridge-line beam missing, 6"x12" ridge-line beam missing, 2"x4" exterior wall at bathroom not per plan, anchor bolts must be no greater than 12" from sill plate edge, 8 hold downs are missing per plan, back porch is not in plans and is 3' from lot line. Set backs are not per plans.