Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Roof Nailing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2024 | COT - RSBU - Roof Nailing | Not Ready | 11/8/23: SIMPSON ABU BASE PLATE need to be added at 4"x4" porch column, ROOF JOIST AT RIDGE BOARD missing nailing per plan (detail S1/3), discrepancy in plans at porch beams (plans call for (2) 4"x8" beams only one is installed, headers at windows and door openings not per plan, openings at bathroom and bedroom missing, 4"x4" wood column supporting 6"x12" ridge-line beam missing, 6"x12" ridge-line beam missing, 2"x4" exterior wall at bathroom not per plan, anchor bolts must be no greater than 12" from sill plate edge, 8 hold downs are missing per plan, back porch is not in plans and is 3' from lot line. Set backs are not per plans. Courtesy inspection on the corrections that need to be made. 11/13/2023 5/7/24: Not ready. per previous |
|
| 06/24/2025 | COT - RSBU - Roof Nailing | Passed | 6/24/25 All corrections have been made. |
|
| 11/08/2023 | COT - RSBU - Roof Nailing | Re-inspection required | 11/8/23: SIMPSON ABU BASE PLATE need to be added at 4"x4" porch column, ROOF JOIST AT RIDGE BOARD missing nailing per plan (detail S1/3), discrepancy in plans at porch beams (plans call for (2) 4"x8" beams only one is installed, headers at windows and door openings not per plan, openings at bathroom and bedroom missing, 4"x4" wood column supporting 6"x12" ridge-line beam missing, 6"x12" ridge-line beam missing, 2"x4" exterior wall at bathroom not per plan, anchor bolts must be no greater than 12" from sill plate edge, 8 hold downs are missing per plan, back porch is not in plans and is 3' from lot line. Set backs are not per plans. |