Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2024 | COT - RSPL - Plumbing Final | Re-inspection required | 5/3/24: receptacle for dishwasher needs to be GFCI protected. Missing receptacle at counter top by fridge. Receptacle in storage closet not working. Clean outs at front of home need to be cut to grade. Exterior pvc on west side of home needs to be painted. Missing plumbing for pressure release valve at water heater. Both A/C units need locks for refrigerant caps. Ac units need to be labled at disconnects. Living spaces need arc fault protected breakers at main panel. | |
| 10/24/2025 | COT - RSPL - Plumbing Final | Canceled | ||
| COT - RSPL - Plumbing Final | Re-inspection required | 10-28-25: wrap all copper lines with R3 insulation, exterior receptacles must be weather resistant, seal exterior wall where pressure relief valve exits wall prevent infestation, seal all holes in water heater closet and correct tear in awg wire, paint all exterior plastics on rooftop, replace kitchen & dining breakers to arch fault & update breaker labeling to include living room, add shackle to water heater breaker, missing vacuum breaker on hose bib, missing hammer arrestor on dishwasher line, seal water closet. | ||
| 11/05/2025 | COT - RSPL - Plumbing Final | Passed | 11/5/25 All corrections made. |