Inspection Status: Not Ready
Inspection History: COT - HCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 05/23/2023 |
COT - HCBU - Preslab |
|
Not Ready |
|
| 05/30/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
for main building slab |
| 07/27/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Loading dock, ramp Eastside still have the center section of the loading dock to go |
| 07/28/2023 |
COT - HCBU - Preslab |
|
Not Ready |
|
| 08/22/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
8/22/2023 Detail 110 for dock leveler. Rebar per plan okay for concrete placement at dock leveler. |
| 08/25/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
8/25/23: okay to pour concrete for ramp down from loading dock, riser room, and sump pit all rebar to schedule |
| 08/29/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
8/29/23 ok to pour concrete flat work on ramp, loading dock and dock sump pit |
| 09/21/2023 |
COT - HCBU - Preslab |
|
Passed |
|