Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
5-19-23: North half. |
| 05/22/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
2nd half by 3rd party spread footers |
| 05/23/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
partial approval for north 1/2 of stem-wall, ok to place concrete |
| 05/30/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
for main building slab |
| 07/24/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
west 1/2 of loading ramp |
| 07/28/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
partial approval for loading dock footers which are now complete |
| 08/03/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
|
| 08/10/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
8/10/2023 partial pass. Looked at stem walls for platform/loading dock and the ramp down side in the north end of the building. Per details 109, 109A, and 113. Rebar per plan okay for concrete placement. |
| 08/22/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
8/22/2023 Detail 110 for dock leveler. Rebar per plan okay for concrete placement at dock leveler. |
| 08/25/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
8/25/23: okay to pour concrete at ramp down from loading dock, riser room, and sump pit all rebar to schedule |
| 09/21/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
|