Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T22CM06464

Parcel: 133290570


Addresses:

8431 E SHILOH ST

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
10/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 10/14/24: top plate penetrations need to be sealed. Registers have to be blocked on three sides. Pex needs to be under test. Fur out walls need to be fire blocked every ten feet. Electrical wiring in furout walls need to be protected with metal sheathing. Stopped inspection
11/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/8/24: site locked, left phone message no response.
11/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 11/13/24: Called John Abbott @ 8:30 am and again @ 2:15 pm with no answer, left message both times. I texted him at 9:26 am with no response to text message or phone message. This is the second time being out on this site with no response or access to house.
11/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required complete corrections
11/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 11/18/24: Fire blocking required at 8' in 10' living room wall, all penetrations through top plates need to be fire foamed, marked all locations missing fire foam on studs below, and vent stack for dryer cannot exit the fire wall between the garage and kitchen,must go all the way to the roof inside the wall.
12/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required
12/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/31/24 corrections have been made.