Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/14/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
10/14/24: top plate penetrations need to be sealed. Registers have to be blocked on three sides. Pex needs to be under test. Fur out walls need to be fire blocked every ten feet. Electrical wiring in furout walls need to be protected with metal sheathing. Stopped inspection |
| 11/08/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
11/8/24: site locked, left phone message no response. |
| 11/13/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
11/13/24: Called John Abbott @ 8:30 am and again @ 2:15 pm with no answer, left message both times. I texted him at 9:26 am with no response to text message or phone message. This is the second time being out on this site with no response or access to house. |
| 11/14/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
complete corrections |
| 11/18/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
11/18/24: Fire blocking required at 8' in 10' living room wall, all penetrations through top plates need to be fire foamed, marked all locations missing fire foam on studs below, and vent stack for dryer cannot exit the fire wall between the garage and kitchen,must go all the way to the roof inside the wall. |
| 12/19/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
|
| 12/31/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
12/31/24 corrections have been made. |