Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCEL - Electrical Final | Not Ready | ||
| 01/19/2023 | COT - LCEL - Electrical Final | Passed | Approved, DGC Clearance to TEP is required for the solar meter (tied to meter #151514626) |