Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
| 05/10/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | If at South Stairs and elevator, 5th lift at West Stairwell. | |
| 05/11/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. | |
| 05/15/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. | |
| 07/06/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. |
|
| 07/07/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. 7/7/23: stair tower #2. Ok to grout to 36 feet |
|
| 07/11/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. 7/7/23: stair tower #2. Ok to grout to 36 feet 7/11/23: stair tower #2. Ok to grout to 40 feet. South wall east of tower #2, 2nd lift approved. North wall to west stair tower, 1st lift approved |
|
| 07/17/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. 7/7/23: stair tower #2. Ok to grout to 36 feet 7/11/23: stair tower #2. Ok to grout to 40 feet. South wall east of tower #2, 2nd lift approved. North wall to west stair tower, 1st lift approved 7/17/23: stair #1 ok to 32 feet, stair #2 ok to 40 feet, elevator shaft ok to 28 feet, 1st lift on north wall. |
|
| 07/19/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. 7/7/23: stair tower #2. Ok to grout to 36 feet 7/11/23: stair tower #2. Ok to grout to 40 feet. South wall east of tower #2, 2nd lift approved. North wall to west stair tower, 1st lift approved 7/17/23: stair #1 ok to 32 feet, stair #2 ok to 40 feet, elevator shaft ok to 28 feet, 1st lift on north wall. 7/19/23: 2nd lift of east & north wall, stairway for #1 to 36 feet. |
|
| 07/21/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. 7/7/23: stair tower #2. Ok to grout to 36 feet 7/11/23: stair tower #2. Ok to grout to 40 feet. South wall east of tower #2, 2nd lift approved. North wall to west stair tower, 1st lift approved 7/17/23: stair #1 ok to 32 feet, stair #2 ok to 40 feet, elevator shaft ok to 28 feet, 1st lift on north wall. 7/19/23: 2nd lift of east & north wall, stairway for #1 to 36 feet. 7/21/23: 1st lift west wall, top out lift east and north walls. |
|
| 07/25/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 07/26/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-10-23: 4th If at South Stairs and elevator, 5th lift at West Stairwell. 5-11-23: 6th lift West Stairwell, 4th lift Elevator shaft and South Stairwell. 5-15-23: 7th lift for Elevator Shaft and Stair Two, and 8th lift for Stair One. 7/6/23: 1st floor, 1st lift on east side and south side to the stair tower. 7/7/23: stair tower #2. Ok to grout to 36 feet 7/11/23: stair tower #2. Ok to grout to 40 feet. South wall east of tower #2, 2nd lift approved. North wall to west stair tower, 1st lift approved 7/17/23: stair #1 ok to 32 feet, stair #2 ok to 40 feet, elevator shaft ok to 28 feet, 1st lift on north wall. 7/19/23: 2nd lift of east & north wall, stairway for #1 to 36 feet. 7/21/23: 1st lift west wall, top out lift east and north walls. 7-25-24: 2nd lift West wall, and South wall to Stair 2. Elevator to 29' 4" above first floor. 7/26/23: elevator shaft ok to grout from 28 ft 8" to 33 ft 4", stair # 2 ok to grout exterior wall from 4 ft to 8 ft on west side. |
|
| 07/27/2023 | COT - HCBU - Masonry Pregrout | Deferred | ||
| 07/31/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 7/31/23: ok to grout top-out lift of 1st floor west wall & top-out lift of north,east,south walls of elevator shaft. | |
| 08/02/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 8-2-23: Elevator piers for I beams at Levels One and Two. | |
| COT - HCBU - Masonry Pregrout | Not Ready |