Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Missing straps and nails plates at plumbing pipes second floor. Missing receptacle for double lav master bedroom. Add blocking underneath tub and at register. Fire foam top penetrations that are not being utilized. 8/24/2023 | |
| 08/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Missing straps and nails plates at plumbing pipes second floor. Missing receptacle for double lav master bedroom. Add blocking underneath tub and at register. Fire foam top penetrations that are not being utilized. 8/24/2023 8/28/23: repair torn vapor barrier in garage,install larger nail plate over 3" soil pipe off-set in garage,install 2nd receptacle at master bathroom lav, 4 studs are over bored on west wall of master bathroom, Install a stud-shoe at each stud. |
|
| 09/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Missing straps and nails plates at plumbing pipes second floor. Missing receptacle for double lav master bedroom. Add blocking underneath tub and at register. Fire foam top penetrations that are not being utilized. 8/24/2023 8/28/23: repair torn vapor barrier in garage,install larger nail plate over 3" soil pipe off-set in garage,install 2nd receptacle at master bathroom lav, 4 studs are over bored on west wall of master bathroom, Install a stud-shoe at each stud. 9/11/23 missing fire blocking and foam penetrations throughout garage and home, air conditioner duct from first to second floor missing fire blocking, shower pans not installed missing water test. Tub plumbing not secured, interior sheathing ripped, caulk or replace STOPPED INSPECTION... |
|
| 09/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/20/23: Contractor has sealed torn vapor barrier in garage. Fire foamed all penetration that are in the top plate. Nail plates have been installed where needed. Receptacle has been installed at Bath #1 sink location. Shower pans and bath tub is installed and under water pressure test. Okay to install drywall, tape, texture and paint interior walls and ceilings. |