Inspection History Details
Inspection Status: Canceled
Inspection History: COT - HCBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2023 | COT - HCBU - Masonry Pregrout | Canceled | ||
| 06/12/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 6-12-23: 1St lift, Building. | |
| 06/15/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial for 2nd lift, okay to grout progress areas | |
| 06/15/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 6/21/23 - Partial for 3rd lift, okay to grout progress areas | |
| 06/26/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 6-26-23: 4th lift, Building. | |
| 06/29/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 6/29/2023 partial pass 5th lift on all walls. Rebar per plan. Okay to grout. | |
| 06/30/2023 | COT - HCBU - Masonry Pregrout | Passed | 6-12-23: 1St lift, Building. 6-26-23: 4th lift, Building. 6/29/2023 partial pass 5th lift on all walls. Rebar per plan. Okay to grout. 6/30/23: passed. Rebar per plan okay to grout and Cap. |
|
| 09/28/2023 | COT - HCBU - Masonry Pregrout | Passed |