Permit: T22CM05039

Parcel: 12112044D


Addresses:

5225 E SPEEDWAY BL

Inspection Status: Partial Pass

Inspection History: zzzPDSD Building Division - Site Excavation/Layout/Rebar

Date Description Inspector Results Comments
04/25/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Partial Pass Partial pass - all main building footings ok to pour.
04/28/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Partial Pass 4/28. All exterior stems and interior stems on main building OK to pour. North and north east site wall footings OK to pour. Partial pass for future use.
05/03/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Partial Pass jeff 602-921-1768
05/08/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Partial Pass Tunnel trench for wash bay. Rebar per plans. Detail 107 and 110. Okay for concrete placement 5/8/2023
05/09/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Partial Pass 5/9/2023 North end wall 225' rebar per plan. Okay for concrete placement in footing.
05/11/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Canceled 5-11-23: Wanted Masonry pre-grout.
06/12/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Not Ready Needed pre-grout inspection.
07/12/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Partial Pass Partial pass - all main building footings ok to pour.
4/28. All exterior stems and interior stems on main building OK to pour. North and north east site wall footings OK to pour. Partial pass for future use.
5/3/23 - Partial 2nd lift (6') at east perimeter wall, okay to grout progress


Tunnel trench for wash bay. Rebar per plans. Detail 107 and 110. Okay for concrete placement 5/8/2023



5/9/2023 North end wall 225' rebar per plan. Okay for concrete placement in footing.

5-11-23: Wanted Masonry pre-grout.

7/12/23: 4 light pole bases approved to pour concrete
09/28/2023 zzzPDSD Building Division - Site Excavation/Layout/Rebar Passed