Permit: T22CM04613

Parcel: 12218222E

Inspection Status: Not Ready

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
02/13/2023 COT - LCBU - Building Final  Not Ready
03/17/2023 COT - LCBU - Building Final  Canceled Not ready for final inspection. Needed a framing and roofing inspection which is under building progress inspection.
04/13/2023 COT - LCBU - Building Final  Partial Pass 4-13-23: Intermediate.
04/21/2023 COT - LCBU - Building Final  Partial Pass 4-21-23: Lath.
06/29/2023 COT - LCBU - Building Final  Partial Pass Not ready for final inspection. Needed a framing and roofing inspection which is under building progress inspection.

4-13-23: Intermediate.

6/29/23: install hard surface landing outside the south exit door (44" in direction of travel X width of door opening). Lock sliding door on south wall and post a sign not for use. Install 12" high street address numbers on the structure at street side.

4-21-23: Lath.
07/20/2023 COT - LCBU - Building Final  Passed Not ready for final inspection. Needed a framing and roofing inspection which is under building progress inspection.

4-13-23: Intermediate.

6/29/23: install hard surface landing outside the south exit door (44" in direction of travel X width of door opening). Lock sliding door on south wall and post a sign not for use. Install 12" high street address numbers on the structure at street side.

4-21-23: Lath.

7/20/23: OK to issue CofO.