Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Final
Permit Number - T22CM04580
Inspection Description - COT - HCEL - Electrical Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - HCEL - Electrical Final | Not Ready | |||
| 10/03/2023 | COT - HCEL - Electrical Final | Not Ready | 10/3/23: not ready for electrical final. Electric intermediate and electric above ceiling have not passed inspection. | |
| 10/12/2023 | COT - HCEL - Electrical Final | Re-inspection required | 10/3/23: not ready for electrical final. Electric intermediate and electric above ceiling have not passed inspection. 10/12/23: not ready, above ceiling incomplete, type panel schedules, move j-box under pick-up window closer to building and finish concrete to match existing. |
|
| 10/13/2023 | COT - HCEL - Electrical Final | Re-inspection required | 10/3/23: not ready for electrical final. Electric intermediate and electric above ceiling have not passed inspection. 10/12/23: not ready, above ceiling incomplete, type panel schedules, move j-box under pick-up window closer to building and finish concrete to match existing. 10/13/23: Not ready for final, no ladder on site, clean roof of all const debris, |
|
| COT - HCEL - Electrical Final | Passed |