Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Intermediate
Permit Number - T22CM04580
Inspection Description - COT - HCEL - Electrical Intermediate
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/13/2023 | COT - HCEL - Electrical Intermediate | Not Ready | 7/13/23: no history of electrical inspection and the walls are covered. | |
09/21/2023 | COT - HCEL - Electrical Intermediate | Re-inspection required | 9/21/23: not ready for elect inspection. All electric in walls covered without inspection. SES not ready. | |
COT - HCEL - Electrical Intermediate | Re-inspection required | 7/13/23: no history of electrical inspection and the walls are covered. 9/21/23: not ready for elect inspection. All electric in walls covered without inspection. SES not ready. 9/28/23: provide all photos of in wall electric that was covered without inspection. |
||
10/04/2023 | COT - HCEL - Electrical Intermediate | Passed | 7/13/23: no history of electrical inspection and the walls are covered. 9/21/23: not ready for elect inspection. All electric in walls covered without inspection. SES not ready. 9/28/23: provide all photos of in wall electric that was covered without inspection. 10/4/23: provide photos of all electric in walls WITHOUT insulation that obstructs inspection of electric. |
|
10/13/2023 | COT - HCEL - Electrical Intermediate | Passed |