Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Building Above Ceiling
Permit Number - T22CM04580
Inspection Description - COT - HCBU - Building Above Ceiling
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/13/2023 | COT - HCBU - Building Above Ceiling | Not Ready | 7/13/23: Not ready for the inspection, open j-boxes and wire not made up, flex duct and registers not installed. | |
08/14/2023 | COT - HCBU - Building Above Ceiling | Canceled | 7/13/23: Not ready for the inspection, open j-boxes and wire not made up, flex duct and registers not installed. 8/14/23: inspection canceled per contractor. |
|
10/04/2023 | COT - HCBU - Building Above Ceiling | Not Ready | 7/13/23: Not ready for the inspection, open j-boxes and wire not made up, flex duct and registers not installed. 8/14/23: inspection canceled per contractor. 10/4/23: not ready |
|
10/05/2023 | COT - HCBU - Building Above Ceiling | Re-inspection required (with fee) | 7/13/23: Not ready for the inspection, open j-boxes and wire not made up, flex duct and registers not installed. 8/14/23: inspection canceled per contractor. 10/4/23: not ready 10/5/23: Not ready. Pay a re-fee before any more inspections. |
|
10/12/2023 | COT - HCBU - Building Above Ceiling | Not Ready | 10/3/23: not ready for electrical final. Electric intermediate and electric above ceiling have not passed inspection. 10/12/23: not ready, above ceiling incomplete, type panel schedules, move j-box under pick-up window closer to building and finish concrete to match existing. |
|
10/13/2023 | COT - HCBU - Building Above Ceiling | Re-inspection required | 7/13/23: Not ready for the inspection, open j-boxes and wire not made up, flex duct and registers not installed. 8/14/23: inspection canceled per contractor. 10/4/23: not ready 10/5/23: Not ready. Pay a re-fee before any more inspections. 10/3/23: not ready for electrical final. Electric intermediate and electric above ceiling have not passed inspection. 10/12/23: not ready, above ceiling incomplete, type panel schedules, move j-box under pick-up window closer to building and finish concrete to match existing. 10/13/23: Not ready, provide a ladder |
|
COT - HCBU - Building Above Ceiling | Passed |