Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2023 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
5-12-23: 1-Setbacks are not according to approved plans. 2-Footings are not 12" below undisturbed soil. 3-Sleeve piping in footings. 4- Install Hold downs per plans. |
| 05/17/2023 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Passed |
Footings have been dug to 12" deep. Sleeves have been installed where sewer line crosses footing. Shear wall hold downs have been installed per plans. Rebar mat needs to be supported with dobies to keep it off of subsoil. |