Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
Permit Number - T22CM04231
Inspection Description - COT - LCBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
04/04/2023 | COT - LCBU - Building Final | Re-inspection required | City approved plans not on site, install address numbers, remove flexible drain, GFCI outlet at bathroom & fountain, install pan at water heater, restroom has several ADA non compliant issues, install two GFCI outlets at the island | |
04/07/2023 | COT - LCBU - Building Final | Re-inspection required | 4-7-23: 1-Bathroom fixtures/accessible units are not per approved plans/Code. 2-Toilet seat is not open front. 3-Receptacles/ dedicated circuit missing for KitchenIsland. | |
04/18/2023 | COT - LCBU - Building Final | Passed | ok to issue C of O |