Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM02751

Parcel: 14101925B


Addresses:

5755 S HOUGHTON RD


Inspection Status: Not Ready

Inspection History: COT - HCPL - Plumbing Above Ceiling

Permit Number - T22CM02751

Inspection Description - COT - HCPL - Plumbing Above Ceiling

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - HCPL - Plumbing Above Ceiling Not Ready
01/06/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Roof drains in CUP area and area “B”, primary and secondary drains at 6” lines. Waste lines in area “B”, 2” and 3”.
03/23/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Roof drains (6” - 8”) South side of area C.
04/24/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Above ceiling for domestic water lines in 4 rooms in South East areas of Sections C and section D.
05/17/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Domestic water lines at 3/4” - 2” in Area C Northwest.
05/19/2023 COT - HCPL - Plumbing Above Ceiling Not Ready Contractor cancelled.
05/22/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #2, Area C, 4 each patient rooms at domestic water lines 3/4” -2”.
05/23/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Area D, 4 each patient rooms; North portion of Area D (3/4” - 1 1/2” lines)
05/26/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Waste line at 6” in East shaft on levels 1 through 5.
05/30/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #2 ADA Rooms (2), North and portion of Area C.
06/01/2023 COT - HCPL - Plumbing Above Ceiling Not Ready Will reschedule for 2 June.
06/07/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #2, Southwest portion of Area C, 6 each special patient rooms: domestic water lines (3/4” - 1”).
06/09/2023 COT - HCPL - Plumbing Above Ceiling Not Ready Contractor cancelled.
06/14/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #2, Patient rooms: 20113, 20113A, 20114, 20114A, 20115, 20115A, 20116, 20116A.
06/16/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Domestic waste and vent lines on Level #2, rooms 20144, 20002, 20003, 20140 (1 1/2” -3”). Domestic water lines at 1/2” - 2” in rooms 20113A, 20114A, 2-115A, 20116A, 20140, 20133, 20134, 20135.
06/20/2023 COT - HCPL - Plumbing Above Ceiling Not Ready Contractor cancelled.
06/23/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #2 corridors North and South in Area C; domestic water lines at 1 1/4” - 3”.
06/26/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Corridor on Level #2, Areas C & D; domestic water lines (1” - 3”) above ceiling.
06/27/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #2. South portion patient rooms and nurses’ station domestic water lines at 3/4” - 2 1/2”
06/28/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Domestic water lines at 3/4” - 2 1/2” lines in patient rooms 30101, 30102, 30103, 30104. Level #3 waste and vent lines at 1 1/2” - 4” at Areas C & D into corridor areas.
06/29/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #3 patient rooms 30105, 3-106, 30107, domestic water lines for bathrooms. Level #3 South portion of Area C waste and vent lines (2 1/2” - 3”)
07/07/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #3, domestic water lines at 1” - 2 1/2” in patient rooms: 30121, 30122, 30123, 20124.
07/12/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #3, patient bathrooms at 30119A, 30120A, two public restrooms, one staff restroom.
07/24/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #3, Southeast portion of Areas C & D
07/26/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #4, domestic waste and vent lines at 1 1/2” - 4” lines throughout level.
08/14/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #4; domestic copper lines at 3/4” - 2 1/2”. East portion of level. Ok to insulate progress areas.
08/31/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #4; areas C & D, copper lines at 3/4” - 2 1/2”.
09/14/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #4, domestic water lines at 3/4” - 2”: partially under hydro test. Will recall when,lines are,under full test.
Fire caulking on elevator fronts on East elevators on Levels #2 & #3.
09/15/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #4, domestic water lines under test: test gauges read 100 psi.
09/20/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Above ceilings in rooms: Exam rooms 10101 through 10108, 10110, EMF lounge, ED Office #1, Nourishment room, corridor at,nurses station, 10100J, 10100F, Soiled room, 10100 corridor
09/26/2023 COT - HCPL - Plumbing Above Ceiling Partial Pass Level #1, Rooms 10204, 10205, 10203A, 10201, 10206, 10147, 10700(corridor).
11/09/2023 COT - HCPL - Plumbing Above Ceiling Passed Level #2 corridors: 200200, 20200G, 20200C, 20100, 20100M, 20100A, 20100H, 20100D, 20200A, 20118, 20117, 20132. Elevators “B” at levels #2 & #3