Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - HCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - HCBU - Preslab |
|
Not Ready |
|
| 01/12/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Pier column footings: F10, F9 at Southwest area of Section A, 4 each footings. Ambulance entry area; 2 pier column footings. Ok to place concrete in progress areas. |
| 02/28/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Level #4, West portion’ of floor slab. Ok to place concrete in progress areas. |
| 04/28/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
West stairwell steps and landings from Level #3 to Level #2. Ok to place concrete in progress areas. |
| 05/16/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
East stairwell, treads from level #1 - #2. Ok to place concrete in progress areas. Loading dock area, two columns, Ok to place concrete in progress areas, |
| 07/06/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Water retention basins inspections were performed on 5 July. |
| 09/06/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Southwest catch basins (2), raised to meet final grade. Dowels epoxied as,per,plan. Loading dock area, 2 each levelers footings. Ok to place concrete in progress areas. |
| 09/07/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Loading dock stairs. Ok to place concrete in progress areas. |
| 09/15/2023 |
COT - HCBU - Preslab |
|
Passed |
Loading dock area and South ramp. Ok to place concrete in progress areas. |
| 12/30/2022 |
COT - HCBU - Preslab |
|
Partial Pass |
Area “C”, Southwest section. Ok to place concrete in progress areas. |