Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Progress
Permit Number - T22CM02751
Inspection Description - COT - HCEL - Electrical Progress
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCEL - Electrical Progress | Not Ready | ||
01/12/2023 | COT - HCEL - Electrical Progress | Partial Pass | Rooms and corridors in Area B: 10504, 10424, 10423, 10422, 10421, 10400A, 10410, 10401, 10402, 10403, 10404, 10405, 10405A, 10414, 10413, 10415, 10416, 10400B, 10417, 10418, 10400C, 10412 | |
01/18/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric intermediate: Door closers at 10400, 10500C, 10700, 10100C, 10154A, 10154B, 10140A, 10140B. Soffits: 10125, 10121. Alcoves: 10100H, 10100G, 10100U, 10100C. Rooms: 10154, 10154A, 10140. | |
02/03/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric in Area A: Rooms: 10153A, 10132, 10108A, 10153, Alcove 10100S, 10100R. Area B: Rooms: 10411, column rough 10509. | |
02/15/2023 | COT - HCEL - Electrical Progress | Partial Pass | Operating rooms, Cath labs in East portion of Area B: 10501, 10502, 10503, 10505A, 10503B, 10503C, 10526, 10527, 10528. Corridors 10500A, 10500B; scrub sinks: 10500J, 10500F, 10T00G; alcove 10500K. | |
02/23/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric grounding system for electric rooms on levels 3, 4, 5. | |
02/28/2023 | COT - HCEL - Electrical Progress | Not Ready | Contractor cancelled. | |
03/06/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls in Level #1, Area A, rooms 10501, 10503, 10503A, 10503B, 10503C, 10527, 10528. | |
03/10/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls, Area C: Rooms; 10153, 10010, 1009, 10307, 10007, 10007A, 10007B, 10007C, 10008, 10304, 10303, 10302, 10301, 10301A, 10310, 10311, 10306, 10308. Alcoves: 10300A, 10300C, 10300D. Corridors: 10000A, 10300, 10300D. Area A, Rooms: 10153, 10202. 10 March 2023 |
|
03/28/2023 | COT - HCEL - Electrical Progress | Partial Pass | Pole light conduit (1”), approximately 40’ of trench line at West portion of site. Ok to cover progress area. | |
04/04/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric inCP Room #10909. | |
04/06/2023 | COT - HCEL - Electrical Progress | Not Ready | Contractor cancelled. | |
04/07/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric in rooms: 10006A, 10005A, 10005, 10309, 10727A, 10727, 10726, 10719, 10716, 10305B in Level #1, AREA C. Level #1, Area D, rooms: 10604, 10602, 10603, 10600, 10609. | |
04/14/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls in rooms: 10700D, 10305, 10305A, 10011, 10012, 10601, 10605A, | |
04/18/2023 | COT - HCEL - Electrical Progress | Not Ready | Contractor cancelled. | |
04/19/2023 | COT - HCEL - Electrical Progress | Partial Pass | Interior electric in walls at rooms: Area C; 10751, 10752, 10753. 10300F, 10300G. Area D; 10515, 10516, 10516A, 10517, 10517A, 10606, 10607, 10608, 10706, 10708. | |
04/26/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls, section D, rooms: 10707, 10725, 10579, 10520, 10521, 10522, 10806, 10701, 10765, 10755, 10610, 10300N, 10300M, 10750. | |
05/03/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric in Area C, rooms: 10006. 10300K, 10300J, 10300I, 10300L, 10702, 10300H; Area D, rooms: 10705D, 10705E, 10705C, 10705A, 10702B, 10702. | |
05/11/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric at Level #1, Area D, rooms: 10723, 10709. Area B, rooms: 10501 OR #1, 10502 OR #2, 10528. | |
05/17/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric in rooms: 10518, 10518A, 10518B, 10523, 10524, 10524A, 10524B, 10525. | |
05/19/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #2, patient rooms: 20104, 20105, 20106, 20107, 20108, 20104A, 20105A, 20106A, 20107A, 20108A, 20109, 20109A, 20110, 20110A, 20111, 20111A, 20112, 20112A, 20103, 20103A. In wall electric. | |
06/02/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #1 in wall electric in rooms: 10001, 10303, 103)3A. Level #2 in wall electric in rooms: 20124, 20124A, 20123, 20123A, 20122, 20122A, 20121, 20121A, 20120, 20120A, 20119, 20119A, 20116, 20116A, 20115, 20115A, 20102, 20102A, 20101, 20101A. Short roof air handlers and exhaust fans: AHU-3, EF1-8, EF1-9, EF-10, EF1-1, EF1-3, AHU-1, SWB1A, EF1-T, EF1-4, EF1-7, EF1-8, EF1-6, AHU-2 SWB1A | |
06/09/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls: 20001, 20210, 20203, 20203A, 20113, 20113A, 20201, 20203, 20203A, 20209, 20214, 20215, 20208, 20200F, 20201A, 20203A, 20212, 20204, 20200D, 20114, 20114A. Level #1, hard lid ceilings in AreaC: 10304, 10311, 10303, 10310, 10301A, 10302, 10727A, 10154. | |
06/16/2023 | COT - HCEL - Electrical Progress | Partial Pass | Roof equipment #ACC-1, Yard equipment CT-1 CT-2, Sediment pumps. In wall electric in rooms 20217, 2000e, 20002, 20137, 20139, 10305B, 10306, 10300, 10300J, 10753, 10608, . South breezeway, 11 canned lights. |
|
06/20/2023 | COT - HCEL - Electrical Progress | Not Ready | Contractor cancelled. | |
06/23/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls at rooms Level #1, Area D: 10721, 10805, corridor of North wall in areas C & D; 20200, 20100, 20100A; hard lid ceilings at rooms 10006, 10603, 105!7A, 10516A, 10519, 10514, 10521, 10725. | |
06/28/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric and above ceiling in Level #1 Cath room. Patient bathrooms on Level #2, canned lighting systems: 20101A, 20102A, 20103A, 20104A, 20105A, 20106A, 20107A, 20108A, 20109A, 20110A, 20111A, 20112A. Stairwell A, 20803, Second floor landing. Level #1 Nurses’ stations 10121 and 10125. | |
06/30/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #1, Areas B and D hard lid ceilings at 10606, 10607, Cath lab #10503, Nurse station #10411. Level #2, Area C, hard lid ceilings at 20124A, 20123A, Level #2, Area D hard lid ceilings at 20122A, 20121A, 20120A, 20119A, 20116A, 20115A, 20114A. | |
07/14/2023 | COT - HCEL - Electrical Progress | Partial Pass | Head walls,on Level #1: 10116, 10115, 10114. 10113, 1<112, 10111, 10110, 10109, 10108 in Area A. In wall rough on Level #3: 30001, 3000A, 30002, 3003, 30100K, 30145, 30146, 30125, 30125A, 30124, 30124A, 30123, 30123A. Level #3, Area D, wall rough: 30122, 30122A, 30121, 30121A, 30120, 30120A, 30119, 30119A. Soffits on Level #2: 20001, 20126, 20113A. | |
07/24/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #1, Area C wall rough: 10713, 10714, 10715, 10716A. Level #1, Area D wall rough: 10702A, 10703, 10704, 10705, 10712. Level #2, Area C wall rough: 20126, 20127, 20143, 20205, 20206, 20207. Level 2, Area D Wall rough: 20100G, 20136, 20145, 20129, 20128. Level #3 Area C ceiling rough: 30101A, 30102A, 30124A, 30123A. Level #3 Area D ceiling rough: 30103A, 30104A, 30105A, 30106A, 30107A, 30122A, 30121A, 30120A, 30119A. Level #2, Area C, corridor 20100R. Level #2, Area D, alcove 20100P. | |
07/28/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls and hard lid ceilings at Rooms: 20138,30142, 30100H, 30131, 30134, 30141, 30142, 30100H, 30100, 30100A, 30100F, 30100G, 20132, 20210. Fire caulking at Level #3, East Shaft. |
|
08/02/2023 | COT - HCEL - Electrical Progress | Not Ready | Contractor cancelled | |
08/04/2023 | COT - HCEL - Electrical Progress | Partial Pass | This inspection is for exterior framing: columns at South side of buildings (6 columns) | |
08/09/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls in rooms: 20100G, 30126, 3-127, 30144, 30100J, 30147, 30128, 30129, 30146, 40803, 40105, 40105A, 40135, 40104, 40104A, 40103, 40103A, 40102. South side columns at GL: K/8 - 13 | |
08/16/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #1, rough ceiling electric at 10100L. Level #2 rough ceiling at 20100P. Level #4, rough in wall electric at 40000A, 40002, 40003, 40112, 40132, 40308, 40307, 40300A, 40300B, 40302, 40303, 40304, 40300 Corridor, 40305, 40306, 40112, 40111, 40130, 40129, 40127 | |
08/18/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #4, Area C: 40100N, 40100H, 40100K. Level #4 Area D: 40100B, 40100, 40106, 40133, 40128, 40100G, 40100G. Level #1, Area D 10713. High roof equipment: AHU-4, AHU-5, AHU-6, EF-4-1, EF-4-2, EF-4-3, EF-4-5, EF-4-5, EF-4-6. Shunt trip disconnects in room 40137, elevators 1, 2, 3, 4, DP4A-HEB1. Level #1 panel boards: Room 10750: P1E-LEB1, P1E-LNB1, P1E-LNB3, ROOM 10144: CT-MP. Breakers in Room 10305A: GEN RAD CB | |
08/23/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #2 in wall electric in rooms: 20101, 20102, 20103, 20104, 20105, 20106, 20107, 20108, 20108, 20109, 20110, 20111, 20112, 30145, 30001, 30003, 30100J, 30141, 40114, 40101, 40101A, Staircase “B” 10811. Fire protection and caulking at 20129. |
|
08/30/2023 | COT - HCEL - Electrical Progress | Partial Pass | Panel boards: P1C-HNB1, P1C-LNB1, P1C-LNB2, P1C-HCB1, P1C-LCB1, P1C-LLS1. Distribution boards: DP1C-LMB1, DP1C-HCB1, MBPC-HUCB1, DP1C-HUCB1. Comm Room Panels: P2A-LLS1, P3A-LLS1, P4A-LLS1. | |
09/06/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #1, Room 10715 above ceiling. | |
09/08/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #4. in wall electric in rooms 40118, 40119, 40209, 40300P, 4010-C, 40200C, 40113, 40100J, 40100M, 40108, 40100A, 40210 | |
09/15/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #2 Head walls at 20204, 20203, 20202, 20201, 20125, 20124, 20123, 20122, 20121, 20120, 20119, 20116, 20115, 20114, 20113. Level #3, Head walls at 30101, 30102, 30103, 30104, 30105, 30106, 30107, | |
09/22/2023 | COT - HCEL - Electrical Progress | Partial Pass | 9/22/23: rescheduled for Monday per James. | |
09/28/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls at Level #1. 10606. Level #2, 20114, 20117, 20117A, 20118, 20118A. Level #3, 30118, Level #4, 40001, 40100M, 40100J, 40101, 40204. | |
10/03/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #3, Area C Head walls: 30125, 30124, 30123. Area D Head walls; 30122, 30121, 30120, 30119. Level #4 in wall electric: 40126, 40125, 40124, 40123, 40121, 40102A, 40200. Level #4 Area C, dry wall ceilings: 40100N, 40117, 40100D, 40100G. East stairwell in wall electric at Levels 1 - 4. | |
10/06/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #4, rooms and alcove above ceilings: 40002, 40003, 40307, 40127, 40126, 40200B, 40200A. | |
10/09/2023 | COT - HCEL - Electrical Progress | Partial Pass | Level #4, rooms and alcoves at 40206, 40201A, 40200, 40128. SES generator breakers #1 & #2 | |
10/13/2023 | COT - HCEL - Electrical Progress | Partial Pass | In wall electric on Level #3 in rooms 30118A, 30125A; Level #4 40200C, 40207, 40113, 40100F, 40119, | |
10/24/2023 | COT - HCEL - Electrical Progress | Partial Pass | 9/22/23: rescheduled for Monday per James. 10/24/23: above ceiling electrical rough-in in room 20201, Headboard electrical rough-in in rooms 20117 and 20118 ok to proceed. |
|
11/03/2023 | COT - HCEL - Electrical Progress | Partial Pass | Headboards on Level #3 at 30118; headboards on Level #4 at 4010q, 40102, 40103, 40104, 40105, 40106, 40121. | |
11/22/2023 | COT - HCEL - Electrical Progress | Partial Pass | Lighting system for West canopy (18 can lights). Level #2, elevator area 200801, 20000A. | |
11/28/2023 | COT - HCEL - Electrical Progress | Partial Pass | Electric in walls at Level #1 elevator area and Level #4 elevator area. | |
12/02/2022 | COT - HCEL - Electrical Progress | Canceled | ||
12/04/2023 | COT - HCEL - Electrical Progress | Passed |