Inspection History Details
Inspection Status: Passed
Inspection History: COT - BULD - SWG Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | COT - BULD - SWG Clearance | Passed | 01/21/2026 Clearance Southwest Gas. Verified all gas fixtures trapped and shutoff valves downstream. |
|
| 12/09/2025 | COT - BULD - SWG Clearance | Re-inspection required | 12-9-25: missing shut off valves and system was not under test. A 15 psi gauge is required and must be under test a minimum of 15 minutes at 15 psi. |