Permit: T22CM02434

Parcel: 137071340

Inspection Status: Re-inspection required

Inspection History: RSBU - Building FinalĀ 

Date Description Inspector Results Comments
05/01/2026 RSBU - Building FinalĀ  Re-inspection required 5-1-26: arch fault breakers are required for each habitable location, install R3 insulation at hose bibs, and vacuum breakers, unit 2-open neutral at kitchen gfci, anti tip device missing at each unit, paint exterior plastic , add plastic bushings to protect wiring at minimum splits, seal mini split whips at exterior walls. Main water line inspection was never inspected- please expose several pockets so that we may verify trench depth and tracer wires. Schedule all pending inspections at same time.