Inspection Status: Re-inspection required
Inspection History: RSBU - Building FinalĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2026 |
RSBU - Building FinalĀ |
|
Re-inspection required |
5-1-26: arch fault breakers are required for each habitable location, install R3 insulation at hose bibs, and vacuum breakers, unit 2-open neutral at kitchen gfci, anti tip device missing at each unit, paint exterior plastic , add plastic bushings to protect wiring at minimum splits, seal mini split whips at exterior walls. Main water line inspection was never inspected- please expose several pockets so that we may verify trench depth and tracer wires. Schedule all pending inspections at same time. |