Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 01/21/2026 All corrections made to 12/10/25 inspection. |
|
| 12/10/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Stand pipe not per code at both units. Provide receptacle per cabinet layout. Provide smoke detectors outside of bedrooms. Add puddy pack to electrical boxes that are back to back at party wall. Extend sub panels for future 5/8" install. Tub along with DWV on test. Secure pex lines horizontally every 32". Provide 18" of copper at main water lines and water heaters before transitioning to pex. Provide two future EV chargers. 12/10/2025 |