Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2023 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 1-Provide approved plans. 2-Existing line has been downsized by insertion of wye fitting. 3-Tracer wire is missing. 4-Multiple underground fittings are vent only fittings. 5- Shower vent connection is below the centerline of drain. | |
| 10/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Not Ready | ||
| 10/17/2023 | COT - RSBU - Excavation/Rebar/Zoning | Not Ready | ||
| 10/31/2023 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 10/31/23: missing rebar at footing, plumbing not wrapped, screen needs to be elevated off ground | |
| 11/09/2023 | COT - RSBU - Excavation/Rebar/Zoning | Not Ready | 1-Provide approved plans. 2-Existing line has been downsized by insertion of wye fitting. 3-Tracer wire is missing. 4-Multiple underground fittings are vent only fittings. 5- Shower vent connection is below the centerline of drain. 10/31/23: missing rebar at footing, plumbing not wrapped, screen needs to be elevated off ground 11/9/23: called at 10:15am no answer, knocked at house no answer, no access. |
|
| 11/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-Provide approved plans. 2-Existing line has been downsized by insertion of wye fitting. 3-Tracer wire is missing. 4-Multiple underground fittings are vent only fittings. 5- Shower vent connection is below the centerline of drain. 10/31/23: missing rebar at footing, plumbing not wrapped, screen needs to be elevated off ground 11/9/23: called at 10:15am no answer, knocked at house no answer, no access. 11/20/23: reinforcement per plan ok to pour. |