Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | Not Ready | ||
| 01/24/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/27/2022 | COT - LCPL - Plumbing Intermediate | Not Ready | provide DWV test. space pex lines 12” from light fixtures. copper lines need to be 18” minimum before connecting to pex. provide fire foam at all top penetrations. |