Permit: T22CM00211

Parcel: 10704002C


Addresses:

1401 W GLENN ST

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Preslab  

Date Description Inspector Results Comments
03/12/2024 COT - HCBU - Preslab   Partial Pass 3/12/24: footings at office/bathroom added for future revision, 1 #5 top and bottom perimeter of office/bathroom. 2 #5 at mid point of office/bathroom running north to south. Slab reinforcement per plan ok to proceed. Steel column closure pour at 11 columns passed. Ok to proceed.
04/11/2024 COT - HCBU - Preslab   Passed Rebar per plan at all door openings and main pad. Okay for concrete placement. 4/11/2024