Case: T21DV06132

Parcel: 11943001A


Addresses:

1655 W AJO WY


Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T21DV06132

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
01/07/2022 INSP - FOLLOW UP CODE ENFORCE Approved FOUND PERMIT IN ISSUED STATUS (T21CMO9017), CONTACTED MANAGER OF THE PARK WHO STATED WORK HAS BEEN COMPLETED AND NEED SOME BACK FILLING OF THE TRENCEHES AND THEN THE FENCE CAN BE REMOVED.
COMPLIANCE / CLOSE CASE.
10/21/2021 INSP - FOLLOW UP CODE ENFORCE Approved SPOKE WITH SABINO ELECTRIC STATING THEY HAVE RECEIVED ENGINEERING REPORT AND PLANS FROM THE ENGINEER AND WILL BE SUBMITTING PLANS BEFORE FRIDAY 10/22.
09/08/2021 INSP - FOLLOW UP CODE ENFORCE Approved PHOTOS AND DOCUMENT SCANNED ONTO ONBASE, THE CASE WAS TRANSFERED TO AREA INSPECTOR GOODMAN
09/08/2021 INSP - FOLLOW UP CODE ENFORCE Approved SPOKE TO SABINO ELECTRIC, THEY STATED THEY DID GET IN CONTACT WITH DSD OFFICIALS WHO EXPLAINED WHAT WAS REQUIRED TO SECURE THE PERMIT, MOST IMPORTANTLY WAS THAT A ELECTRICAL ENGINEER WOULD BEE NEEDED TO PROVIDE CALCS OF THE PARK. SABINO STATED THEY HAVE ALREADY CONTACTED AND SECURED THE ELECTRICAL ENGINEER FROM GLHN ARHITECTS AND ENGINEERING AND HAVE PROVIDED HIM THEIR SCOPE OF WORK. HE NEEDED INFORMATION FROM DSD AND THEN WOULD GO OUT TO THE PARK TO PROVIDE INFORMATION REQUIRED BY DSD. SABINO STATED THEY WOULD WAIT TO SECURE THE PERMIT ONCE ALL INFORMATION WAS IN TO DSD SO THAT DSD COULD INFORM THEM WHAT INSPECTIONS WERE NEEDED AND COULD BE COMPLETED UNDER ONE PERMIT. PERMITTING PROCESS IN PROGRESS.
09/07/2021 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, I FIRST DROVE THE PARK AND DID FIND THE TRENCHES AND FENCING PROVIDED BY INSPECTOR VALDEZ BECAUSE OF THE POSSIBLE HAZARDS CREATED BY THE TRENCING. I FOUND THE TRENCH DUG FROM ONE TRANSFORMER TO THE NEXT INSIDE THE PARK. IT DID APPEAR THAT BARRICADES WITH FLASHING LIGHTS AND CAUSTION TAPE FROM BARRICADE TO BARRICADE WAS ORIGINALLY PROVIDED NEXT TO THE TRENCHING. STEEL PLATES WERE PROVIDED WHEN TRENCING CROSSED THE STREETS OR DRIVEWAYS. I DROVE TO THE MANAGERS OFFICE AS THE OFFICE DID NOT OPEN UNTIL 9 AM, I SPOKE TO THE MANAGER WHO PROVIDED ME THE LEAD MAINTANENCE INFORMATION (WHO WAS NOT TO BE IN UNTIL 10 AM) , THE ELCETRICIAN CONTACT SABINO ELECTRIC, AND THE COMPANY THAT DID THE TRENCHING PRO PIPE. I CONTACTED SABINO ELECTRIC AND WAS DIRECTED TO THE SUPERVISOR FOR THIS PROJECT, HE INFORMED ME THAT SABINO WAS DOING THE ELECTRICAL WORK AND THAT PRO PIPE MARKED ALL THE WATER ANE ELECTRICAL LINES AND WERE RESPONSIBLE FOR THE TRENCHING AND STATED HE WAS PRETTY SURE THAT BARRICADES AND CAUTION TAPE WAS SET UP NEXT TO THE TRENCH. I MENTIONED THAT MANY OF THE BARRICADES HAD BEEN KNOCKED DOWN OR BLOWN OVER AND SOME BARRICADES IN THE TRENCHES. SABINO MANAGER STATED THEY HAVE NOT BEEN OUT IN SOME TIME BECAUSE OF THE WEATHER. I ASKED SABINO ELECRIC IF THEY HAD A APA ACCOUNT WITH THE CITY AND COULD QUICKLY SECURE A PERMIT, THEY STATED THEY DID HAVE A APA ACCOUNT. CONTACT INFORMATION FOR 3 PEOPLE WERE GIVEN TO SABINO SO THEY WOULD FIRST CONTACT AND SPEAK TO A PERSON WHO WOULD INFORM THEM OF WHAT SHOULD BE INCLUDED ON THE PERMIT AS SABINO HAD SEVERAL QUESTIONS I COULD NOT ANSWER. SABINO LATER MADE CONTACT WITH DSD AND SOME DIRECTION WAS PROVIDED.
I ALSO SPOKE WITH THE LEAD MAINTANENCE PERSON WITH THE PARK WHO IFORMED MEET AGAIN THE A SABINO ELECTRIC WAS DOING THE ELECTRICAL WORK AND THAT PRO PIPE HAD MARKED ALL UTILITY LINES AND COMPLETED THE DIGGING AND PLACED THE BARRICADES. I EXPLAINED I HAD ALREADY CONTACTED SABINO ABOUT NEEDING SECURE A PERMIT. I STATED THAT BECAUSE OF THE STOP WORK ORDER WORK WOULD NOT BE ABLE TO CONTINUE, THAT THE FENCING WOULD NEED TO STAY IN PLACE UNTIL WORK WAS COMPLETED AND TRENCHES FILLED AND I DID INFORM HIM THAT THE FENCING WOULD BE VERY EXPENSIVE. MAINTANENCE STATED BECAUSE OF THE KIDS IN THE AREA THE BARRICADES HAVE BEEN THROWN INTO THE DITCHES AND CARS RUNTHRU THE BARRICADES AND CAUTION TAPE. I STATED IT WAS THE PARKS RESPONSIBILITY TO KEEP ALL BARRICADES IN PLACE BEFORE THEY LEFT FOR THE DAY. MAINTANENCE STATED THEY WOULD CONTINUE TO FOLLOW UP WITH SABINO ELECTRIC ABOUT THE PERMIT.