Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSPL - Plumbing Final | Not Ready | ||
| 04/12/2024 | COT - RSPL - Plumbing Final | Re-inspection required | 6/22/23: homeowner informed that they need contractor make a letter stating they are taking responsibility for the addition for the life of the property. ROC# must be present and active on letter. 7/20/23: Remove sheet rock to expose work done. 7/26/23: Structural Electrical Plumbing HVAC error issues. Remove ALL drywall and insulation for full thorough inspection. 4/12/24: hot and neutral reversed at bathroom GFCI, drain at bathroom lav must be smooth material, exterior GFCI must be WR, lock out caps missing at A/C unit, Arc-fault breaker's missing at multiple locations. |
|
| 05/17/2024 | COT - RSPL - Plumbing Final | Passed | 5/17/24: Letter has been submitted by contractor taking full responsibility of addition for the life of the property and will be liable for all work done. See letter in attachments. | |
| COT - RSPL - Plumbing Final | Re-inspection required | |||
| 07/20/2023 | COT - RSPL - Plumbing Final | Re-inspection required | 7/20/23: Remove sheet rock to expose work done. | |
| 07/26/2023 | COT - RSPL - Plumbing Final | Re-inspection required | 7/26/23: Structural Electrical Plumbing HVAC error issues. Remove ALL drywall and insulation for full thorough inspection. |