Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
Permit Number - T21CM08148
Inspection Description - COT - LCBU - Framing
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Framing | Not Ready | ||
06/07/2023 | COT - LCBU - Framing | Not Ready | ||
COT - LCBU - Framing | Re-inspection required | |||
07/20/2023 | COT - LCBU - Framing | Re-inspection required | 7/20/23: Remove sheet rock to expose work done. | |
07/26/2023 | COT - LCBU - Framing | Re-inspection required | 7/26/23: Structural Electrical Plumbing HVAC error issues. Remove ALL drywall and insulation for full thorough inspection. 1/23/2024 J&A General Construction assumes all liability, see attachments |